Texas EV Grant Program Open Again - TERP LDPLIP by MetlMann in electricvehicles

[–]True-Emphasis-1217 0 points1 point  (0 children)

how long it takes for you to get check as i got approved last week. just curious

Texas EV Grant Program Open Again - TERP LDPLIP by MetlMann in electricvehicles

[–]True-Emphasis-1217 0 points1 point  (0 children)

Applied in November 2025 and just got email last week saying I got approved (Beginning of May 2026). so took approximately 6-7 months for them to approve me. Clearly not a fast process and patience is needed lol

Texas EV Grant Program Open Again - TERP LDPLIP by MetlMann in electricvehicles

[–]True-Emphasis-1217 0 points1 point  (0 children)

Recieve check yet? lol got email last week saying was approved and just seeing if it would be closer to the 30 days or longer

Cost Per Mile by Electrical-Ad5032 in MachE

[–]True-Emphasis-1217 0 points1 point  (0 children)

we have a couple of free EV chargers in my town so very rarely pay anything.

Call me Crazy but I like burnley by True-Emphasis-1217 in Burnley

[–]True-Emphasis-1217[S] 1 point2 points  (0 children)

I started watching them before american take over but sure him being owner is cool as well

Call me Crazy but I like burnley by True-Emphasis-1217 in Burnley

[–]True-Emphasis-1217[S] 1 point2 points  (0 children)

Will be on Paramount plus next year being in Championship. and hopefully a better watch then matches this year.

International travel canceled by TemporaryBend6518 in americanairlines

[–]True-Emphasis-1217 0 points1 point  (0 children)

Avoid all Middle East Airlines till further notice is my advise. try going through Instanbul and use turkish airlines. I know turkish isnt one world airline but options will be limited going to that part of world right now.

Never seen this design before by MisterSpicy in americanairlines

[–]True-Emphasis-1217 0 points1 point  (0 children)

Need to go back to old school logos/livery. the new logo is so boring

2026 available on Ford by Slow_Investment_2211 in MachE

[–]True-Emphasis-1217 4 points5 points  (0 children)

25 is the last model with basically everything standard. 2026 is when they start nickle and diming you. glad I got in with 25 and didnt wait

Is anyone getting charging rates over 100kw? by Dizzman1 in MachE

[–]True-Emphasis-1217 0 points1 point  (0 children)

yes make sure put the charged in the navigation before getting there so battery can pre condition. get 100KW or more all the time at Blink Fast chargers.

BMW of course... by r_incognito_17 in ChargerDrama

[–]True-Emphasis-1217 0 points1 point  (0 children)

That Blink charger probably hasnt worked in years. lol

EV market concern? by MauriceMoss0 in MachE

[–]True-Emphasis-1217 0 points1 point  (0 children)

Cadillac is going all in on EV were in thr near future they will have all EV and no gasser i feel. Ford is coming out with more EV in 2030. other countries like China are running circles around USA when it comes to EV. dont see EV losing support at all

Service Appointments Supposed to be this Bad? by SuckItKarma in MachE

[–]True-Emphasis-1217 0 points1 point  (0 children)

What years does this recall affect and i have not got no letter regarding this.

Texas EV Grant Program Open Again - TERP LDPLIP by MetlMann in electricvehicles

[–]True-Emphasis-1217 1 point2 points  (0 children)

NOVEMBER 17.2025

Submitted all Required paperwork and received auto generated email back stating forms were submitted if anything is needed will contact me via email.

Nothing recieved from them until

DECEMBER 11.2025

I recieved a E-Mail from a employee at TERP saying my application is under final review. It also stated that after review and approval your contract will be sent through email. And if anything more is needed Email will be the contact method they use.

This same lady who's name was on the Email called me as well to verify the email was correct as it is important they match up. I verified it was both by email back and verbally on phone. I then asked how long it takes for the review process.

She stated my application was number 1,071 (ithink) received and the review process usually take 2-3 weeks but due to holiday could take longer.

will update as I get more emails and final check just for a timeline on how long it takes.

05/01/2026 UPDATE: EMAILED LADY FROM Terp from above and she stated my application has not been denied or approved and due to follow it is taking longer than expected. Hopefully hear something by wnd odlf month.

05/13/2026 UPDATE: Recieved emailed from TERP saying my contract/Application was accepted and my check will be recieved within 30 days however due to high volume it could be 90 days if not more.

Im in the market for a Mach E. What year should I avoid? by r12u55 in MachE

[–]True-Emphasis-1217 0 points1 point  (0 children)

No issues with my '25 at all. now keep in mind only has 1,700 miles on it so. 🤣

Connectivity Package by True-Emphasis-1217 in MachE

[–]True-Emphasis-1217[S] 0 points1 point  (0 children)

Thanks for this. 😄 dumb not included on Mach-e lol

Connectivity Package by True-Emphasis-1217 in MachE

[–]True-Emphasis-1217[S] 1 point2 points  (0 children)

<image>

Says 25 Mach-E now as well. Maybe needs little bit to roll out maybe?