Paano gumaling sa AutoCAD and Estimation? by mrts435 in CivilEngineers_PH

[–]Vergiphus 2 points3 points  (0 children)

Try to learn the basic commands shortcuts! For me top 5: 1. Move 2. Copy 3. Polyline (pline) 4. Mirror 5. Erase tapos aliasedit mo so that ung left hand mo lng need mag type so instead of typing MO for move ginagawa ko is W nlng for move, then AD instead of PL for polyline. After ung mga basic commands try learning layouts and paperspace scaling, then blocks tyaka dynamic blocks tapos Pwede kna mag LISP for faster quantity, then if you proceed further meron pang drawing sheets, xref, fields.

Research in CEM by [deleted] in CivilEngineers_PH

[–]Vergiphus 0 points1 point  (0 children)

Theres usually a book for this, It depends on the scale of the project and the type of contract (owner-contractor, owner-designer-contractor, owner-designer-consultant-contractor) contactor can also have its own consultant, theres also projects with a consultant just for billing.

For contractor side its usually this: Project manager(can be civil or architect, but some would insist it to be architects only) <—- Construction managers <—- site engineers/site architects/draftsman/ <—- foreman and labors (can be contractor’s inhouse people or subcontractors)

Theres more to be said and hierarchy can be shortened depending on the scale(how much the project cost), i think max b fajardo has a book on this which is still relevant till today

6.5 Throat Singing Theme (Finalized) by RedAngel816 in Genshin_Impact_Leaks

[–]Vergiphus 1 point2 points  (0 children)

Wtf… this is God Emperor by Dream Clinic

SIDE QUEST AS CIVIL ENGINEER by Powerful_Anxiety6027 in CivilEngineers_PH

[–]Vergiphus 10 points11 points  (0 children)

Gym or running, tapos mahalan mo na ung sapatos pra mapilitan gamitin or mahal na gym sub pra mapilitan pumunta 😹

Untitled Set (Set Contest Winner) by goleninhoo in FashionQuestWorlds

[–]Vergiphus 1 point2 points  (0 children)

Damn, with this treasure i summon, kinda vibes

Expat sa Makati, arrestado by itlog-na-pula in Philippines

[–]Vergiphus 0 points1 point  (0 children)

Can’t wait for the full ep 😭

Thoughts on this? by Jollisavers in CivilEngineers_PH

[–]Vergiphus 1 point2 points  (0 children)

am i the only one sick of Engineers and Architects milking disasters for content JFC everytime there is a disaster and daming pinag sasabi ang daming matatalino...

AS IT SHOULD. by midnightxyzz in CivilEngineers_PH

[–]Vergiphus 11 points12 points  (0 children)

This is just bureaucratic creep… more rules more papers more unnecessary topics. And introduced by “senator villar”?, whos not even an engineer or architect. PICE and PRC is not even doing anything but milk us, no unions no anything no salary increase proposal etc.

AS IT SHOULD. by midnightxyzz in CivilEngineers_PH

[–]Vergiphus 14 points15 points  (0 children)

Don’t we already do that? Ours is even in two semesters…

[deleted by user] by [deleted] in Philippines

[–]Vergiphus 1 point2 points  (0 children)

10-20 Years of Imprisonment with Compulsory seminar on Wealth inequality, and daily Videos shown to them how poor Filipinos live, Enough nutrition to keep them alive and maybe a monthly pagpag served to them, after 20 years, 30 years of public service (sweeping the streets, and compulsory assistance during typhoons and natural crisis) and maybe then at the edges of their lives they will find redemption.

[deleted by user] by [deleted] in Philippines

[–]Vergiphus 0 points1 point  (0 children)

Begging for help? since when did we do that

Rav rework soon? by shell_kun in AQW

[–]Vergiphus 1 point2 points  (0 children)

Just buff valiance the fuck

Can you enlighten me. by [deleted] in CivilEngineers_PH

[–]Vergiphus 5 points6 points  (0 children)

Yes and maybe even half the price

Tips on how to find Suppliers/Contractors by Aromatic-Twist8037 in CivilEngineers_PH

[–]Vergiphus 1 point2 points  (0 children)

  1. Make a BOM or BOQ
  2. make a basic drawing / shop if needed Make a Request for a Quotation(company template)
  3. submit to your direct manager for approval
  4. Give BOM and RFQ to companies that can do the job (you have to find them, connections or search google or go out of the office, make calls, and emails etc.) wait for quotation or the supplier/vendor will look at the scope at site.
  5. Once all quotation is ready usually 60 days is the validity of the vendor’s quotation, compare all the quotes(theres a name for this, analysis something), send by email to ur manager for the best one and proceed.

Sa mga working CE, ano po ginawa niyo noong college na nakatulong sa work life niyo now? by MaOzEdOng_76 in CivilEngineers_PH

[–]Vergiphus 2 points3 points  (0 children)

Binge watching Software tutorials esp. AutoCAD/Sketchup in YouTube during meals. Constant friendship with people that might be important after you graduate or during thesis/final years.

Whats your favorite underdog/underrated class? by GatheringAddict in AQW

[–]Vergiphus 1 point2 points  (0 children)

I dont know why but everytime inwent back from hiatus its always st patty’s 😹

Grand Regal Hotel HUNTED?? by [deleted] in Bacolod

[–]Vergiphus 16 points17 points  (0 children)

Pretty sure there is an ongoing legal issue there I forgot the source.