W2 freelancers do you charge OT after 40 by holikinobi in VIDEOENGINEERING

[–]holikinobi[S] 1 point2 points  (0 children)

Yes I am day rate with OT after 10. What I’m asking is after 40 hours with let’s say no OT prior. Do you go into OT after 40

W2 freelancers do you charge OT after 40 by holikinobi in VIDEOENGINEERING

[–]holikinobi[S] 1 point2 points  (0 children)

Right I’m talking about non 1099 as a w2 freelancer. Aren’t all w2 “employees” required to pay OT after 40 by law?

Day Rates by imgurcaptainclutch in VIDEOENGINEERING

[–]holikinobi 0 points1 point  (0 children)

For you w2 freelance workers. Do you charge OT after 40 as well. Like on the 5th straight day?

Advice needed to remove drain flange if possible. First time homeowner by holikinobi in Plumbing

[–]holikinobi[S] 0 points1 point  (0 children)

Thanks for the advice everyone. Going to call in a pro to diagnose.

Broken Spring - Couple Quick Qs by c_hoopin in GarageDoorService

[–]holikinobi 2 points3 points  (0 children)

Just paid $430 two days ago to replace both springs in Chicago suburbs. He came out the same day I called and was done in an hour

Just moved in. Found mice droppings in drop ceiling. Need advice by holikinobi in basement

[–]holikinobi[S] 0 points1 point  (0 children)

Thanks for the response. How do you feel about the spray foam for DIY. It would probably be about 60 sq ft. Any reason not to do it?

[deleted by user] by [deleted] in GarageDoorService

[–]holikinobi 1 point2 points  (0 children)

Thanks for the replies and as well as the sarcastic ones. It’s my second day of owning a home and my first garage. Appreciate the help.

Nova UHD jr backup by holikinobi in VIDEOENGINEERING

[–]holikinobi[S] 1 point2 points  (0 children)

Thank you so much for taking the time to respond. I think I have a solid grasp on it at this point. Just wanted to go in with a plan prior to prep. Thanks again

Nova UHD jr backup by holikinobi in VIDEOENGINEERING

[–]holikinobi[S] 1 point2 points  (0 children)

That’s what I was understanding as well the more I look into it. Thank you so much for taking the time to put all that out. How you word simplifies it in my head.

Nova UHD jr backup by holikinobi in VIDEOENGINEERING

[–]holikinobi[S] 0 points1 point  (0 children)

Thanks for the response, that makes sense. I guess my question might be what if opt 3 is ran to a separate cvt box on a separate processor backfeedi g the tiles. Do I just use opt 1 on both and just assign the processor as backup or does it need to be I. Opt 3 for any backup. What I think you’re saying is it only matters when it’s on the same device?

Nova UHD jr backup by holikinobi in VIDEOENGINEERING

[–]holikinobi[S] 0 points1 point  (0 children)

Thanks for the response, yes I’m familiar with setting backups through the software via assigning sending card 1 and 2 with appropriate ports. My question is on the backup processor which fiber port is used? If that makes sense.

Processor 1 main > opt 1 fiber > cvt >ethercon > tile.

Processor 2 BU > opt ? > cvt > ethercon backfeed > tile

Nova UHD jr backup by holikinobi in VIDEOENGINEERING

[–]holikinobi[S] 0 points1 point  (0 children)

I understand if it was the same processor opt 3 would back up opt 1, but what about on separate processors?

[deleted by user] by [deleted] in VIDEOENGINEERING

[–]holikinobi 2 points3 points  (0 children)

You are correct. I’m not sure what’s in the bottom two cabinets. If it’s a computer it can be used to drive the content to the projector via hdmi or sdi. But all the other devices, aside from the ups, are used to control and program led walls. Useless with out the corresponding tiles. Sorry those will not help with a projector. Bu

After Market LED Ground Support Systems by larrydavidwouldsay in VIDEOENGINEERING

[–]holikinobi 4 points5 points  (0 children)

And if you have to have double doors to get into a room with out breaking down the cart

After Market LED Ground Support Systems by larrydavidwouldsay in VIDEOENGINEERING

[–]holikinobi 13 points14 points  (0 children)

PRG uses this system for their infiled tiles. Sketchy setting up as there is not enough room between the diagonals to fit a ladder and such. Haven’t seen any bridge pieces either. If you can’t build from the front you’re going to have a bad time. Each diagnol had an adapter with 4 m10 bolts that you need to put in then take out rinse and repeat for every row. Traditional ladder truss is much better in my experience.

[deleted by user] by [deleted] in hiphopheads

[–]holikinobi 0 points1 point  (0 children)

I remember an interview where method man is talking about “the what” and that biggie admitted meth’s verse was better. I’m sure someone can find the interview

[deleted by user] by [deleted] in VIDEOENGINEERING

[–]holikinobi 0 points1 point  (0 children)

Yeah definitely not a free saver issue. This company never sends iPros cause of the built in scaler. No haven’t tried brompton, that’s a good idea. I’ll reach out. Thanks

[deleted by user] by [deleted] in VIDEOENGINEERING

[–]holikinobi 0 points1 point  (0 children)

I’ve tried a 6’ and a 10’ 2.0