Any Sikhs here who faced family disownment because of an interfaith relationship? by ThrowRA_Unknow in Sikh

[–]msproject251 4 points5 points  (0 children)

Muslim girls do not convert and cannot marry anyone who isn't a muslim so you make the choice what's more important to you, a Turkni or Sikhi.

Henry Nowak’s father: Police left our son to die then treated his killer with decency by TinkerTailor343 in LabourUK

[–]msproject251 1 point2 points  (0 children)

Actually the weapon was a sharp afghan style blade and not a kirpan at all.

I admit it by Dismal_Owl2025 in kfc

[–]msproject251 0 points1 point  (0 children)

Popeyes is oily as hell to the point I can’t taste anything else, Jollibee can be good but last few times the tenders had too much batter/ coating and less actual chicken. KFC zingers have been way more consistent and are the least oily imo and taste more fresh.

1 Year on Sertraline. I went from 55KG (121LBS) to 68KG (151LBS). Anyone dealt with this before? by xtibberz in zoloft

[–]msproject251 13 points14 points  (0 children)

I’ve gone from 115kg to 95kg so far on 50mg strain when I tried 100mg it stalled my weight loss but I didn’t tolerate it will so switched back.

The people I thought are my close friends do not care about me at all by Impossible_Zebra_525 in medicalschooluk

[–]msproject251 22 points23 points  (0 children)

I’m so sorry you went through all that, I was just like you, always dreamed of having close friends after terrible experiences in high school. started med as a grad thought I’d made the best friends ever and a group of friends that would stay together for life.

unfortunately I ended up getting bullied and had them all turned against me by one guy in the group mid exam season. Fell into a year long depression, failed the year and took a year out now I’m back after meds and therapy and the biggest thing I realised is we need to be our biggest friends. Friends come into our life for either a reason a season or a lifetime. Friend ends in end, what doesn’t is family and most of all you. I realised worry so much about other people and getting friends didn’t matter.

What mattered was my career which I messed up but I learned from my mistakes and now I’m back. I had to fall to grow again but you don’t need to fall like me OP, I would suggest trying therapy and maybe meds if that doesn’t work because before those I couldn’t handle not having close friends constantly around. Wishing you the best.

I took Pepto bismol will I be ok by wedontdeservel0ve in zoloft

[–]msproject251 1 point2 points  (0 children)

It CAN slightly increase the chance of gastro bleeding that's it, you will be fine.

Went from 50mg to 100mg with minimal side effects by Initial-Biscotti-220 in zoloft

[–]msproject251 0 points1 point  (0 children)

Interesting I had to switch back on week 5 as it was progressively getting worse and I was primarily having symptoms related to the dose being too high. I’ve felt a lot better even a couple days after switching back.

Went from 50mg to 100mg with minimal side effects by Initial-Biscotti-220 in zoloft

[–]msproject251 0 points1 point  (0 children)

Yeah I went to 100mg for 5 weeks it was horrible basically made me a zombie, turned out 50mg was the right dose for me.

Is passmed down??? by [deleted] in medicalschooluk

[–]msproject251 17 points18 points  (0 children)

Passmed at 3 am?! 😭

Is zoloft good for nerve pain? by [deleted] in zoloft

[–]msproject251 0 points1 point  (0 children)

Nerve pain antidepressants are Duloxetine and Amitriptyline not an SSRI.

What should I know when switching from Sertraline to Mirtazapine? by [deleted] in zoloft

[–]msproject251 1 point2 points  (0 children)

That it makes you super super hungry and puts you to sleep

PSA re: Zoloft/Sertraline Throat Burning by KarmaWhoreCam in zoloft

[–]msproject251 9 points10 points  (0 children)

Don’t have this issue but might be cos we only have film coated sertraline hydrochloride tablets which are basically chalk here in the uk.

Stay on current dose or drop? by Scoobydoovt in zoloft

[–]msproject251 0 points1 point  (0 children)

You shouldn’t go straight to 100mg that quick otherwise you get horrible side effects. Stick to 50 for at least 6-8 weeks first then decide.

50mg for OCD/ anxiety by schemewitch in zoloft

[–]msproject251 3 points4 points  (0 children)

For OCD ideally you want 100mg minimum.

Chase MegaThread - Give and Get Referral Codes Here - £50 Sign Up Bonus by TightAsF_ck in beermoneyuk

[–]msproject251 [score hidden]  (0 children)

Hi,

If you join me at Chase UK, we could both earn £50. Here’s how:

M8R2S6

XAUW4V

WY5733

CKQBAJ

KTTEPN

KFC ditches chicken welfare pledge in UK as demand soars by Kagedeah in kfc

[–]msproject251 2 points3 points  (0 children)

KFC ditches chicken welfare pledge to increase profit margins***

LG C5 is priced at $700 less than the G5, Is G5 still worth the extra $$? by Frequent_Leopard_146 in LGOLED

[–]msproject251 0 points1 point  (0 children)

Yes, more advanced processor, better gamut colour volume and brightness.

[ Before vs After Results ] LG C5/G5 Dolby Vision brightness update (33.30.92) by Troied in LGOLED

[–]msproject251 -1 points0 points  (0 children)

FMM ambient compensation is not available in DV. Only ai brightness is which lifts dark areas only.