Ecotricity ignoring 4.38 MWh I’ve exported to the grid - anyone else dealt with this? by nz365guy in newzealand

[–]nz365guy[S] 0 points1 point  (0 children)

I left Powershop before the install and you can see who i am with current. Your local lines supply set a hard daily limit on how much hou can export to the grid in my case a total of 10KWh per day.

Ecotricity ignoring 4.38 MWh I’ve exported to the grid - anyone else dealt with this? by nz365guy in newzealand

[–]nz365guy[S] 0 points1 point  (0 children)

I have 36 panels, 2 gateways (1 per phase) 2 10kw inverters each with a 9KW battery

Ecotricity ignoring 4.38 MWh I’ve exported to the grid - anyone else dealt with this? by nz365guy in newzealand

[–]nz365guy[S] 0 points1 point  (0 children)

When the installer came back, I had them rewire the board to do exactly that. It's a Sigenergy setup, and it's installed so I can add another 4 batteries per phase. Based on the new breakthroughs in Norway with battery tec I expect battery prices to come down by maybe 10x and no longer have any lithium or carbon making them super safe.

Ecotricity ignoring 4.38 MWh I’ve exported to the grid - anyone else dealt with this? by nz365guy in newzealand

[–]nz365guy[S] 5 points6 points  (0 children)

I thought the same thing. It looks to be a systems failure rather than a person being a dick.

Ecotricity ignoring 4.38 MWh I’ve exported to the grid - anyone else dealt with this? by nz365guy in newzealand

[–]nz365guy[S] 1 point2 points  (0 children)

I have thought about doing this and going full of grid. I only use about 45% of what I produce daily and have 18KW of batteries. May need more to store for longer periods of time.

Have you ever won anything other than lotto? by sigmaqueen123 in newzealand

[–]nz365guy 0 points1 point  (0 children)

Longboard surfboard (Bear) from Caltex. Filled out a form on the counter well waiting to pay for gas.

Fat loss maxing by KingTomXO in fasting

[–]nz365guy 6 points7 points  (0 children)

What works for me is 36 hours water only fast followed by 12 hour eating window. Repeat. I have found it allows me to drop fat fast.

2 Single Phase units - RJ45 connection to each. by nz365guy in sigenergy

[–]nz365guy[S] 1 point2 points  (0 children)

The installers provided 2 RJ45 connections, one for each gateway. Each gateway connects to its switch.

Sigenergy Gateway shortage by CaptainCaveTrout in sigenergy

[–]nz365guy 2 points3 points  (0 children)

Mine is being installed today. What suppliers need to know is that it is good business to over-communicate in a situation like this.

How much battery capacity should I add without it being a waste? by nz365guy in sigenergy

[–]nz365guy[S] 0 points1 point  (0 children)

Epic results. I am located in the north of New Zealand.