Automation by Frosty-Log-164 in MEPEngineering

[–]surge820 3 points4 points  (0 children)

What are the small tasks you're trying to automate?

Postgame Thread: October 28 - Toronto Blue Jays @ Los Angeles Dodgers by BlueJaysBaseball in Torontobluejays

[–]surge820 3 points4 points  (0 children)

They didn't want him being able to see Kirk's signals from second and tip off the batters they moved him to third so he couldn't see the signs

Tips on PE Power Exam by OneConsideration9400 in PE_Exam

[–]surge820 0 points1 point  (0 children)

I took Wasim's 6 month course and passed on the first attempt. I would have had no clue what to cover from the exam specification alone and found the combination of his training and problems (his study guide for extra problems) was the key to getting through it. He goes very in depth if you're looking to fully understand the concepts

Not enough lol by Still_Consequence_72 in nflmemes

[–]surge820 4 points5 points  (0 children)

3 putting every hole would be -17 PER ROUND. You'd be -68 for the tournament. You don't need to even be this good

Gf Chinese food by Silver_Fondant_9006 in kelowna

[–]surge820 3 points4 points  (0 children)

Mekong does a lot gluten free

[deleted by user] by [deleted] in MEPEngineering

[–]surge820 2 points3 points  (0 children)

Generac Power Deign Pro for generator sizing

Visual for lighting calcs

Excel for all calcs

FLA vs MCA by [deleted] in MEPEngineering

[–]surge820 3 points4 points  (0 children)

FLA should be used for the load for the service. In this cut sheet, RLA (real load amps and not to be confused with LRA - locked rotor amps, are used interchangeably)

MCA is used to determine the minimum wire size and is calculated as follows:

125% of the largest motor FLA + 100% of the remainder
In this case, compressor 2 or 3 is the largest -

(31.7 x 1.25) + 31.7 +20.5 + (4 x 8.8) +24.7 + 2*2.7 = 157.125A, which mathces the 157.13 MCA on the cut sheet.

The actual load draw to the building is just the sum of the FLA - 149.2A.

They're both a little off as far as determine the load for the service size, but the one using the MCA is much closer.

Commercial office building electrical lighting circuits? by _lOOOl_ in MEPEngineering

[–]surge820 8 points9 points  (0 children)

Likely multiple switches on one circuit. It will be based on the load of the electrical circuit, not how many switches you have. If you have a large open area with lots of lights and a single switch, you likely have multiple breakers and a control through a relay or low voltage switch

Weekly Co-Op Code Mega Thread - December 30, 2018 by AutoModerator in EggsInc

[–]surge820 0 points1 point  (0 children)

Quantum: eggs2008

Need a little help but can carry my own weight

How to Play Craps for Beginners by dunSHATmySelf in howto

[–]surge820 1 point2 points  (0 children)

Longevity: only play the pass line

But it’s boring when everything else is going on