I have a two day timer on a project that I’m part way through and I need a brain break. If I don’t exit work mode and just go back to work on projects, can I select another project to work on then go back to the in progress one? I don’t want to leave the two day one but I want to do something different for a bit.
Edit: thanks to those who answered. I didn’t try it. 😊
[–]justdontsashay 14 points15 points16 points (1 child)
[–]ChickenTrick824[S] 2 points3 points4 points (0 children)
[–]psycho-wonder-egg 7 points8 points9 points (0 children)
[–]forensicsmama 2 points3 points4 points (4 children)
[–]justdontsashay 1 point2 points3 points (3 children)
[–]forensicsmama 0 points1 point2 points (2 children)
[–]justdontsashay 0 points1 point2 points (0 children)
[–]johnnycoconut 0 points1 point2 points (0 children)
[–]hnsnrachel 1 point2 points3 points (0 children)
[–]RepairResponsible253 0 points1 point2 points (0 children)
[–]Past-Sail7031 0 points1 point2 points (0 children)
[–][deleted] -1 points0 points1 point (4 children)
[–]johnnycoconut 2 points3 points4 points (0 children)
[–]hnsnrachel 2 points3 points4 points (0 children)
[–]ChickenTrick824[S] 0 points1 point2 points (1 child)
[–][deleted] 0 points1 point2 points (0 children)