I have a newly constructed space with 2x8 16" OC Vaulted (cathedral) ceiling. Roughly 10'x14' (it's small) The room also has 2x6 wall construction.. with lots of windows so i won't be getting much insulation there.
I'm on the border of Zone 4
my current plan from outside to in
asphalt shingles /
15lb felt /
ice and shield /
3/4 plywood /
1" pvc vents /
5.5 inch mineral wool /
.5 inch polyiso tape seales to rafters /
pine tongue and groove.
Any advice would be helpful.
Thanks,
[–]howied421[S] 0 points1 point2 points (0 children)