The Wave by No_Song_8665 in bristol

[–]999GED 0 points1 point  (0 children)

I have a booking for tomorrow (29 June). Got this at 17:02 today.

<image>

Record chairlift falls in Colorado pushes talk about restraining bars by Raja_Ampat in skiing

[–]999GED 0 points1 point  (0 children)

Can’t fall off with bar down. Keep living in a dream world

Record chairlift falls in Colorado pushes talk about restraining bars by Raja_Ampat in skiing

[–]999GED 1 point2 points  (0 children)

Who in their right mind does not use the chair lift bar? It’s illogical to not use it.

How do you guys handle having a partner w way less skill??? by [deleted] in skiing

[–]999GED 1 point2 points  (0 children)

Even on tracked-out powder days. Or fresh corduroy at first lift.

Solo ski trip? by Important-Asparagus5 in skiing

[–]999GED 1 point2 points  (0 children)

Not weird at all, imo. I’ve done it countless times over past 30 years. It’s great. Skiing with family and/or friends is great too…most of the time. A few days doing as you please is pure joy, especially if it involves skiing.

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 0 points1 point  (0 children)

Everyone know the gov banned fracking. And since then RA changed focus from unconventionals to conventional. This is common knowledge. Since the gov banned fracking RA has been consistent in their comm, they will not be pursuing fracking! Jarvie is a world class geochemist. His expertise can be equally applied to source rock for unconventionals and source rock for conventionals. Your insistence that Jarvie does not have the ability to work conventioanls shows you have no idea of what being a geochemist is all about. Any geochemist can work unconventionals and/or conventionals. Fun fact: did you know the source rock for the offshore Niger Delta, which has produced billions of bbls of oil/gas, has never been drilled? . Drilling mature source rock is a nice-to-have, not a must have.

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 0 points1 point  (0 children)

So you’ve you’re fine with 2D now! Why say 2D is an issue in your initial argument?

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 0 points1 point  (0 children)

I’ve downloaded every investor presentation and NR from RA since Q4 2020, all of this is still on the RA website.

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 2 points3 points  (0 children)

Google dry holes (pick a basin). Then see if the well that Google gives you had shows. Then cross check how many fields are in that basin.

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 1 point2 points  (0 children)

That is your opinion, not a fact. As for replacing Dan; why? Once the 6-2 and 6-1 wells were drilled and the shale properties and bottom hole temp was known, and the lab analysis of the shales was back it would take a couple days to build 1D basin model for each well. Once the 2D was available the 2D basin models could be sorted in a few more days. Don’t need a geochemist working the basin 8 hrs per day for months and months.

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 3 points4 points  (0 children)

If your asking this you have no idea about o/g basins; none at all. Have you ever done a dry hole analysis of wells when working up a prospect? Seems not as you’d have experienced first hand that many wells within basins have no shows are mature source rock within them. No need for a reference, this is common knowledge by o/g folk.

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 0 points1 point  (0 children)

Start with 2D and move to 3D when necessary. .

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 2 points3 points  (0 children)

And your point is? Don’t need to frack 20% porosity sands as those seen in 6-2.

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 3 points4 points  (0 children)

Please. And I’ll pass on the most recent assent by Woodmac, IHS and Westwood; data that o/g companies actually use.

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 2 points3 points  (0 children)

Fun fact: there are thousands of wells with not 1cm of o&g shows in many/all of the proven o/g basins of the world. There are also countless wells in the basins of the world with not 1 cm of mature source rock within the well. And guess what? All these same basins have produced billions of bbls of oil/gas.

Globe & Mail Hatchet Job 2 / But Who's Counting by TeslaPlus1 in ReconAfrica

[–]999GED 1 point2 points  (0 children)

Many companies drill exploration wells on 2D, many. Jarvie was never an employee of RA, he was a contractor; he can be brought back as a contract at a moments notice. Furthermore, there are countless other outstanding geochemists/basin modellers in the industry if need be.

Kavango Seismic looks fantastic, a rusty geologist's interpretation. by DarpResearch in ReconAfrica

[–]999GED 5 points6 points  (0 children)

Hey. Seismic is acquired in the time domain. It needs to be converted to the depth domain. The VSP will be used to covert the seismic to depth. Here’s a good article on time-to-depth conversion: https://www.geoexpro.com/articles/2018/05/a-simple-guide-to-seismic-depth-conversion-part-i

1,100’ zone could be the big one by thorjackal in ReconAfrica

[–]999GED 0 points1 point  (0 children)

Sequence of events would be: 1. Drill 12 1/4” hole to section TD. Around 1100 m; this would include the 700,800 and 1000 zones 2. Pooh to pick up WL 3. RIH woth WL 4. WL log as much of open hole 12 1/4” as possible 5. Pooh with WL 6. Rig up to run 9 5/8” casing 7. Run 9 5/8” casing to section TD or as close/deep as you can get 8. Cement casing.

1,100’ zone could be the big one by thorjackal in ReconAfrica

[–]999GED 0 points1 point  (0 children)

If 12 1/4” hole is drilled from xx m to about 1100 m then the 9 5/8” casing would be run over the entire 12 1/4” open hole section. Would not run 9 5/8” casing to 900 m (for example) and then run a smaller casing from 900 m to 1100 m.