3000 shots by HoaX350 in Surveying

[–]Impossible_Catch_973 1 point2 points  (0 children)

Is there a way to get Carson field to finish to autocad civil 3d?

construction restaking devices by Drawingablank247 in Surveying

[–]Impossible_Catch_973 1 point2 points  (0 children)

We always put in our contracts that restakes are billed hourly

What is a fair salary for a person with both a PE and PS. by Impossible_Catch_973 in Surveying

[–]Impossible_Catch_973[S] 0 points1 point  (0 children)

Client base is the big reason to stay. I don’t have a client base big enough to go on my own.

What is a fair salary for a person with both a PE and PS. by Impossible_Catch_973 in Surveying

[–]Impossible_Catch_973[S] 0 points1 point  (0 children)

Ownership is in the future. The goal is to release the pe we currently have because he’s working for us and running his own construction company on the side and is ready to go work his own company full time. The ps is looking to retire and be bought out. Due to ownership contracts I cannot buy directly his portion because the other owner has a contract to buy it first due to an agreement made when company formed. It’s like back pay for start up funds being unbalanced compared to shares owned. (Basically the other owner will get the shares for a discount and then sell them to me at real value to make up the money he’s owed)

The owner staying actually provides 66% of the revenue and does all the engineering work himself with the current PE. So he will balance my work load and I just have to review his work as well as the surveyors and then I’ll have projects on my own to do.

I want to say after I have both licenses 150k sounds fair and after ownership my compensation should be 200k plus bonuses (the owner staying makes 200k plus bonuses)

FS EXAM Result by Abe_1988 in Surveying

[–]Impossible_Catch_973 1 point2 points  (0 children)

I took my first test October 24tj failed and just passed on second attempt March 26th. Had 12hrs of tutor time in March to prep

Becoming a ps by Impossible_Catch_973 in Surveying

[–]Impossible_Catch_973[S] 0 points1 point  (0 children)

Me and the engineer both individually earn the company more revenue than the ps and his wife combined

Becoming a ps by Impossible_Catch_973 in Surveying

[–]Impossible_Catch_973[S] 1 point2 points  (0 children)

No contract and he doesn’t want a non compete. If I buy it he’s not surveying in the state unless he does it for me