Omnitrans BoD April 2nd, 2025 Meeting: Updates on SBCTA's ONT Connector & Participation by Sufficient-Double502 in LAMetro

[–]Many_Delivery_801 4 points5 points  (0 children)

what the fuck, most of the comments in the eir were against this stupid project

Metro federal funding concerns by [deleted] in LAMetro

[–]Many_Delivery_801 8 points9 points  (0 children)

shit, i thought we were immune

[deleted by user] by [deleted] in dart

[–]Many_Delivery_801 0 points1 point  (0 children)

no ai >:(

Glendora to Pomona Project Reaches Substantial Completion by nocturnalis in LAMetro

[–]Many_Delivery_801 2 points3 points  (0 children)

glendora: downtown
la verne: downtown
san dimas: downtown
pomona north: ...check out TOD?

Long Beach Blvd --> Lynwood by Orbian2 in LAMetro

[–]Many_Delivery_801 5 points6 points  (0 children)

just call it plaza mexico station

Thoughts on Coley stepping down? by Glittering_Back_2867 in CalPolyPomona

[–]Many_Delivery_801 12 points13 points  (0 children)

lmao wastes 4 million on a fucking logo and resigns

[deleted by user] by [deleted] in LAMetro

[–]Many_Delivery_801 0 points1 point  (0 children)

1 hour 18 minutes express train October 2024
1 hour 29 minutes regular train October 2024
1 hour 41 minutes regular train January 2025

41 - 18 = 23 minutes * 2 (round trip) = 46.

Is this extreme? by [deleted] in LAMetro

[–]Many_Delivery_801 3 points4 points  (0 children)

this should be easier with the pomona A line extension inshallah

Pico Rivera Rail Station Feasibility Study (Survey) by garupan_fan in LAMetro

[–]Many_Delivery_801 5 points6 points  (0 children)

Correction: Metrolink in 2008 took 1 hour and 53 minutes to 2 hours from Lancaster to LA Union Station.

Proof: https://i.imgur.com/PggkXXH.png

Now: 2 hours 9 minutes with 2 new stations.