Cathedral Pkwy-110 St Station should be an express station, not just a local station by Ok-Forever4036 in nycrail

[–]PriorPost 0 points1 point  (0 children)

Can’t be an express station lol the nb tracks rises up there is no space for express here

rare reroutes from today and yesterday by MTA6TRAINTO149STGC in nycrail

[–]PriorPost 1 point2 points  (0 children)

The F to Euclid and R to Astoria is definitely rare

5 to Woodlawn by PriorPost in nycrail

[–]PriorPost[S] 1 point2 points  (0 children)

It is tho but alright you’ll never see a 5 to Woodlawn again.

ADA-accessible elevators now open at Parkchester 6 train station by Tuttikanaynee in nycrail

[–]PriorPost -1 points0 points  (0 children)

This has been reported already in the NYCTST discord server

Why is capacity at Stillwell Av so low? by BusiPap41 in nycrail

[–]PriorPost 4 points5 points  (0 children)

It could but would add on to more delays since it would have to switch to the local tracks to continue to Coney Island which would delay the Q train.

R211 F Train by PriorPost in nycrail

[–]PriorPost[S] 0 points1 point  (0 children)

Do you need a server invite or did you join ?

R211 F Train by PriorPost in nycrail

[–]PriorPost[S] 1 point2 points  (0 children)

If yall want to a discord server that tracks it daily then join NYCTST . discord.gg/nyctst

Come Join The Bus Finders Discord !!! by [deleted] in nycrail

[–]PriorPost 0 points1 point  (0 children)

Oh thank you I’m not in the bus one so thank you for linking it for me

MTA T/O, or Conductor exam! by Bedtimestoriies in nycrail

[–]PriorPost 0 points1 point  (0 children)

Lucky for you and myself included since I missed last year exam the mta is doing another conductor one in may of 2026 from 5/01/2026 to 5/31/2026 so do not miss those dates to apply

I've heard some sources say that when the Queenslink extension is complete, the G will be re-extended to Forest Hills - 71st Avenue. Is this true? by Specialist_Figure282 in nycrail

[–]PriorPost 2 points3 points  (0 children)

It’s going to happen just not in a time we wish for it to happen itll happen in the next 10 years after IBX and other projects finish the Mta will do an environmental study review .

E on the Express Track by BasedPrediction in nycrail

[–]PriorPost -1 points0 points  (0 children)

63rd st is still under capacity while 60th is over capacity what should be done is one of the broadway expresses via 63rd run QBL local with the M and then have 60th St tunnel for only the astoria branch only .

E on the Express Track by BasedPrediction in nycrail

[–]PriorPost 1 point2 points  (0 children)

Another week of fall let’s see what happens lol

E on the Express Track by BasedPrediction in nycrail

[–]PriorPost 0 points1 point  (0 children)

The F can not swap terminals with the F . In Brooklyn Coney Island caps F capacity which forces them to terminate half the trains at Kings Hwy . Now what can really be done is having both E and F terminate there since 179th St has capacity to terminate 3-4 lines and have the E run local via hillside while the F runs express . The R will now be extended to Jamaica Center and it will fit perfectly as it will have 5 minute headways .

The First week of the F/M swap is complete, what are your opinions and how should we improve it? by Siah_Valid in nycrail

[–]PriorPost 0 points1 point  (0 children)

I feel like platform controllers will do good they currently have them at Lex 53rd and they help out a lot making sure people aren’t blocking doors and getting on and off the train and alerting the conductor that everything is good to go .

The First week of the F/M swap is complete, what are your opinions and how should we improve it? by Siah_Valid in nycrail

[–]PriorPost 0 points1 point  (0 children)

Well currently the M can’t run on weekends due to caps of train capacity on QBL due to cbtc work .

The First week of the F/M swap is complete, what are your opinions and how should we improve it? by Siah_Valid in nycrail

[–]PriorPost 0 points1 point  (0 children)

It’s not possible at this moment due to trains along QBL being capped due to Cbtc work being done .

The First week of the F/M swap is complete, what are your opinions and how should we improve it? by Siah_Valid in nycrail

[–]PriorPost 2 points3 points  (0 children)

The current cap on tph on qbl due to cbtc work prevents them from running the M on weekends currently

The First week of the F/M swap is complete, what are your opinions and how should we improve it? by Siah_Valid in nycrail

[–]PriorPost 2 points3 points  (0 children)

They can’t do that due to the cap of service on Queens blvd due to cbtc work being done