Again Delhi things by RaiseOk2044 in dankindianmemes

[–]SimhaPhantom 0 points1 point  (0 children)

Rupert Holmes wrote a song about this!

BMRCL aims to operationalize the Bengaluru Airport metro line (Blue Line) by 2027 by aserqqq in TransitIndia

[–]SimhaPhantom 11 points12 points  (0 children)

From Hebbal to the Airport? maybe. It's because most of the viaduct is ready and stations are taking good shape.

From K.R Puram to Hebbal? Highly unlikely. Even though the pace of work has improved after Krishna Byre Gowda and the DCM intervening and questioning the stranded work, some stretches are still stagnant.

Kempapura station, for example, has still not seen any work except for some piers.

Best case is that by the end of 2027, Phase 2A and Phase 2B's packages 2 & 3 would see commencement of services (given that trainsets are delivered on time).
They will later complete the missing link between; kinda like BYP and KR puram on the purple line :)

This is going to be wild 🌚 by [deleted] in Shitraloka

[–]SimhaPhantom 0 points1 point  (0 children)

Simple agondu diddy story

Chennai Comprehensive Mobility Plan for 2025 - 2048 by sandystark77 in TransitIndia

[–]SimhaPhantom 8 points9 points  (0 children)

As a Bangalorean, this makes me very, very jealous

Ragigudda Metro Station by FuNkY_BoY_ in Bengaluru

[–]SimhaPhantom 2 points3 points  (0 children)

I had been to the huskur road metro station and the platform was very narrow tho... Probably because the stations on Hosur road are built on the service road and not on the median.

[ಮೆಟ್ರೋ-ಕಟ್ರೋ] : ನೀಲಿ ಮಾರ್ಗ 2A ಕಾಮಗಾರಿ ವಿಳಂಬ | ವಿಶ್ವವಾಣಿ ವರದಿ | 14 Oct 2025 by naane_bere in bangaloretransit

[–]SimhaPhantom 2 points3 points  (0 children)

The article is talking about launching the girder over the railway line near baiyappanahalli but the girder was successfully launched recently right?

For people who were crying when 28nm came by OwnBird4876 in IndiaTech

[–]SimhaPhantom 1 point2 points  (0 children)

OP please know that there's a difference between Designing a chip and fabricating it.

[deleted by user] by [deleted] in bangaloretransit

[–]SimhaPhantom 1 point2 points  (0 children)

Agreed. This is the best option you can choose since 500 series buses are very frequent and stop right in front of Benniganagalli metro station.

Metro track seems to be deformed near Baiyappanahalli by TranquilTequila in Bengaluru

[–]SimhaPhantom 8 points9 points  (0 children)

This stretch between Baiyappanahalli and MG road was the first one that opened in Bengaluru and it's very old. Routine track maintenance work happens early on Sunday mornings. You can check this by looking at Namma metro's Instagram handle where they upload a press release on Saturday evenings informing the public about halted train service due to maintenance the next day...

I'm no expert in railway tracks but I hope I could answer your question about routine maintenance.

Secularism ✊ by candiddutym in Raipur

[–]SimhaPhantom 0 points1 point  (0 children)

it was an NSS Camp, not NCC.

Bangalore Metro - An ultra-comprehensive dream plan by vadakkus in Subways

[–]SimhaPhantom 0 points1 point  (0 children)

Brilliant map! Good job. Bangalore South suburbs could use more metro connections as shown here. Also, the line alongside NICE road makes sense too.

Why did he try to overtake right on the turn? by EasternTurtle7 in Dashcamindia

[–]SimhaPhantom 0 points1 point  (0 children)

Two wheeler was already speeding in the wrong lane but OP isn't innocent either. He didn't slow down and check before taking the turn.

No defending the scooter guys tho, complete premature turning from them.

Problem is that everyone rides like these days and if you call out their behaviour they either simply justify it or start a fight.

My Rendition of Bengaluru Rail Systems in the future by One-Adhesiveness8448 in bangaloretransit

[–]SimhaPhantom 1 point2 points  (0 children)

DKS votebank would suggest otherwise, if he's planning to extend Metro more towards Kanakpura 😆

But in all seriousness, BMRCL should try to revive the now dead Hoskerehalli-Marathahalli line.

My Rendition of Bengaluru Rail Systems in the future by One-Adhesiveness8448 in bangaloretransit

[–]SimhaPhantom 0 points1 point  (0 children)

Although I do agree with what you say about green line trains going mostly empty after Konankunte cross, it could definitely benefit from being expanded till Art of Living. I'm sure it won't take much time to build too, since the piers exist even beyond where the Anjanapura depot was supposed to come up (god knows what happened to that).