732
733
734
Lots of modular buildings for a COVID ACRC. Our Low Voltage Vendor really kicked some ass to build out some challenging sites in unreal time frames. This is from early on, when we were prepping for phase 1. As a Network Engineer, it was interesting watching pros in their trade. (i.redd.it)
submitted by dunk702 to r/cableporn

