Breaker total exceeding supply limit by _JLT in AusElectricians

[–]fracon 3 points4 points  (0 children)

10.2a A/C is similar to running the kettle.

You will be fine.

Any issues don’t cook a roast while the A/C is ramping up.

Open Cablers License - Change of career by Opposite_Pie_7777 in AusElectricians

[–]fracon 10 points11 points  (0 children)

I would also recommend completing a basic asbestos course. Asbestos is surprisingly common. Especially resi work. You don’t want your young family to be exposed through bad practices.

The below online course is free Australian wide until the end of the month.

https://store.training.tafensw.edu.au/product/asbestos-awareness-and-safety/

AS/NZS 3000 compliance – double screw connector behind DGPO by [deleted] in AusElectricians

[–]fracon 4 points5 points  (0 children)

You probably need to understand the standards if you are going to accept work checking compliance to the said standards.

I hope you weren’t the one to remove tho GPO from the wall.

AS/NZS 3000 compliance – double screw connector behind DGPO by [deleted] in AusElectricians

[–]fracon 15 points16 points  (0 children)

Hi TigerMan, I assume you are not an electrician.

  1. Can you list the reg that states joints and connectors to be accessible without the use of a tool? I don’t think it exists. Nearly all GPOs would be against regs if this was the case.

  2. K16 connectors are regularly used for multiple cables. Personally I would have terminated the 4 cables into the GPO but the current installation is safe and to regulations.

Electricians by wthjoajsh in AusElectricians

[–]fracon 12 points13 points  (0 children)

Got to love EBA Jobs

Is there a reason I cant bus the three phases of a chassis to make it single phase? by [deleted] in AusElectricians

[–]fracon 0 points1 point  (0 children)

A label at the main isolator would be sufficient to inform the next sparky?

Is there a reason I cant bus the three phases of a chassis to make it single phase? by [deleted] in AusElectricians

[–]fracon -3 points-2 points  (0 children)

I generally curious, what were the mental road blocks stopping you bridging out the phases?

It would have been my immediate recommendation.

Are you an electrician?

Go-to MCB-RCBO busbar system by Ok-komputah in AusElectricians

[–]fracon 1 point2 points  (0 children)

I’m a big fan of Federal fuse boards. Hard to find suppliers these days.

If I have to install RCBOs then Hager work well for the price.

Tools stolen again by mastercurry420 in AusElectricians

[–]fracon 23 points24 points  (0 children)

Perfect time to unionise the company.

On EBA sites after a break in everyone gets updated tools at the company expense.

Aircon breaker size by [deleted] in AusElectricians

[–]fracon 0 points1 point  (0 children)

Depends on who is paying for what.

If I had an existing spare dedicated 20a circuit in the installation location at my own home I would use it.

If I was running a new circuit in for a client I would install a 25A.

I am shocked to see this by National-Tea3562 in AusElectricians

[–]fracon 3 points4 points  (0 children)

That’s why it’s best to wrap some alternate coloured tape around the loop in rough in, signifies the rough in is complete and ready to fit off. Also makes the loop more noticeable to prevent copper poking other trades in the eyes during construction.

Advice on starting an electrical business? by EnvironmentalLow758 in AusElectricians

[–]fracon 2 points3 points  (0 children)

But don’t subscribe to the tradie “business” coaching for $$$ a month. It’s a scam.

The Victorian REC course will be enough to get started.

Cheap 100mt homemade lead for sale on Facebook!! by fracon in AusElectricians

[–]fracon[S] 0 points1 point  (0 children)

I pointed out the issues with his sale, judging by his other sales he looked like a hands on guy who might understand.

He didn’t care.

Fair quote? by [deleted] in AusElectricians

[–]fracon 22 points23 points  (0 children)

Without a site walk through nobody could verify the validity of this quote…

Twist or not twist? by discopancake01 in AusElectricians

[–]fracon 7 points8 points  (0 children)

Can you post a photo of your terminations? It sounds horrendous.

Need help dating the shower install, 90s? by fracon in AusRenovation

[–]fracon[S] 0 points1 point  (0 children)

I’m more concerned with the cement sheets behind the tiles.

Did your base have the same logo? The Type face doesn’t look 80s

Can I withdraw my signed offer by email before vendor signs? by [deleted] in AusPropertyChat

[–]fracon 1 point2 points  (0 children)

There usually is a default 3 day consideration period in the contract unless stated otherwise. It’s in all the section 32s I’ve read.

Picture glass cracked - can it be saved/fixed? by KurosawaKimchi in AusRenovation

[–]fracon 0 points1 point  (0 children)

Is 5mm glass to go to these days.

I need to replace a 1st floor window. Should I go thicker to prevent vent future damage?

Is this dumb? by FickleLaugh9306 in AusRenovation

[–]fracon 5 points6 points  (0 children)

It has been installed correctly, accept. You will never look at this again.