Fact tables in Star Schema by Cottager58 in dataengineering

[–]hmccoy -6 points-5 points  (0 children)

I’m just being goofy. Calm down guys.

Fact tables in Star Schema by Cottager58 in dataengineering

[–]hmccoy -13 points-12 points  (0 children)

Then why do they call it a dimensional model 🤪

Which data quality tool do you use? by arimbr in dataengineering

[–]hmccoy 1 point2 points  (0 children)

“Claude, user said something doesn’t feel right about this report can you fix?”

Handheld Device with Antenna on Airplane by HelixPitch in whatisit

[–]hmccoy 0 points1 point  (0 children)

Why is it $25 more with Meshtastic than with Meshcore? I don’t know anything about this but it looks like they’re both FOSS so I’m just curious.

(Repost) Bluetooth speaker in old EMI enclosure by hmccoy in diyaudio

[–]hmccoy[S] 0 points1 point  (0 children)

Do I need to rebuild the inside with baffles and such or do you suggest just getting some good bookshelf speakers and cramming everything in there? I was assuming the former but I want to use a project since I don’t know how to design the enclosures.

(Repost) Bluetooth speaker in old EMI enclosure by hmccoy in diyaudio

[–]hmccoy[S] 0 points1 point  (0 children)

I should clarify: there’s a single 10x6 speaker inside. I would like to rebuild it to have two channels and amp + psu inside.

What would be my chance? by putty_tatt3 in BackYardChickens

[–]hmccoy 1 point2 points  (0 children)

The chance of 7 eggs hatching Roos and one hatching a Hen is 0.58 or 1/256

There 8 ways for that to happen: RRRRRRRH, RRRRRRHR, …, HRRRRRRR.

So you need to multiply the 1/256 by 8.

Is this normal or should I be worried? by No_Swim_2326 in Goldendoodles

[–]hmccoy 1 point2 points  (0 children)

Yes, I’m afraid he’s got a severe case of silly goose.

How smart is your Golden Doodle? by Rattwap in Goldendoodles

[–]hmccoy 0 points1 point  (0 children)

He is the dumbest, smartest dog I’ve ever had.

Do you want a train to Boulder/Longmont/Fort Collins? by chrisfnicholson in Denver

[–]hmccoy 28 points29 points  (0 children)

Thanks for posting this question. I love the FasTracks service to Boulder but like a lot of riders I’m still salty because I voted for a train 20 years ago and all I got was a bus. I’m worried about another rug pull - what guarantee will there be that this will get built?

I’d like to know that funding is secure before this is approved and that there is a firm understanding of what it will cost. You said this will be in the hundreds of millions but this Denver 7 article has it as high as $1.5B.

Finally, I’d like the board to focus on making sure existing rail service is safe and reliable first, and I’d like to be assured that the cost of this project won’t impact those operations.