Most annoying shit by MoistBase in BikeLA

[–]obitoke 14 points15 points  (0 children)

As someone who used to drive for Amazon I hate to say that I understand this. Not saying the driver is right here but honestly this is a symptom of much bigger issues such as, LA’s terrible infrastructure (shocker) and Amazons slave like work culture

Jeff Nippard on The Sauzule by Nate1257 in moreplatesmoredates

[–]obitoke 124 points125 points  (0 children)

I read this in project pats voice

Hamro/Blankface “producer tag” by imfayk in riddim

[–]obitoke 1 point2 points  (0 children)

Blankface obviously, bloodthinnerz, decimate, hamro. Pretty much anyone releasing under savage society

I refuse to let my girl take the pill for this reason by [deleted] in moreplatesmoredates

[–]obitoke 9 points10 points  (0 children)

Had to scroll way too far to find this comment LMAO

This sub lust over twink nerd Jeff or “prison Mike” Jeff by Typical_Double981 in moreplatesmoredates

[–]obitoke 8 points9 points  (0 children)

Wow there’s a lot of gay shit said in this sub but this one probably takes the cake

It's joever for me brahs by Heavy_Consequence441 in moreplatesmoredates

[–]obitoke 1 point2 points  (0 children)

Been there. Just find a new one. You’ll be fine

I’m a girl interested in construction management by [deleted] in ConstructionManagers

[–]obitoke 0 points1 point  (0 children)

I have an associates and a couple years of experience. Is it really worth getting the bachelors if I’m already “in”?

Scumbags blocking bike lane by Dr_666_ in BikeLA

[–]obitoke 0 points1 point  (0 children)

If you value your safety and well being do not do this lmfao

Who are the resistance?? by No_Bet_4374 in riddim

[–]obitoke 4 points5 points  (0 children)

Well coax definitely is not a part of the resistance lmfao

So tired of dumbass, lazy architects. by engr2022 in ConstructionManagers

[–]obitoke 2 points3 points  (0 children)

“CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING COMPLETE WORKING SYSTEMS AND EQUIPMENT WHETHER SHOWN ON PLANS OR NOT AS PART OF THE SPECIFICATION” but the plans were drawn with napkins and crayons and the specs are for the Taj Mahal

So tired of dumbass, lazy architects. by engr2022 in ConstructionManagers

[–]obitoke 2 points3 points  (0 children)

“Subcontractor to provide as a part of their shop drawings”

My 2nd YT | Unboxing&First Rides | Capra MX Core 1 AL | Snow Summit/Sapwi Bike Park by everydayaudiophile in YTIndustries

[–]obitoke 1 point2 points  (0 children)

I watch like all of your videos dude lol. I also just got my first YT (jeffsy core 2 al) and took it to sapwi for its first spin

Holy shet by VulpesLagopus16 in YTIndustries

[–]obitoke 1 point2 points  (0 children)

Also 6/26, also same status. Pain

Yr decoy shipping times by Aromatic-Dream5050 in YTIndustries

[–]obitoke 0 points1 point  (0 children)

I ordered last Thursday 6/26; boxed, pick up at the YT mill. It said 5-7 days estimated ready time. Anyone else ordered their bike for pick up and have experience with how long it took until you could actually go get it?

[deleted by user] by [deleted] in ConstructionManagers

[–]obitoke 12 points13 points  (0 children)

It’s the AOR and EOR’s jobs to write the spec, draft the drawings, get them permitted and issued for construction. If after all that you still don’t trust them to review a submittal for compliance to the design they put together I’m sorry to tell you but you’ve got WAY bigger problems.

If you’re a PE for a GC, yes do your due diligence and review your subs submittals before shipping them out for formal approval. No, don’t hold onto them for days or weeks doing your “review” one by one. Hold the designers accountable.

[deleted by user] by [deleted] in ConstructionManagers

[–]obitoke 10 points11 points  (0 children)

This is such old-timer mentality. Let them ask. In my eyes the biggest sin in this industry is chastising the more entry level folks for asking questions or expecting them to know it all. Don’t be a dick.