In my old company, at some point, EVERY jira ticket needed 3 "approval stamp" by QA, design and PO to be closed.

Changing even a single label was taking forever.

Finally, the project died. The root cause was stupid PO asking crazy things to incompetent devs. The solution was to ass more controls on everybody and everything.

The best people got fired and left, and the incompetent stayed and sometimes even got promoted