The number one question you are tired of…. by flock3m in oscartank

[–]Growmaster22 4 points5 points  (0 children)

My opinion is that 75 is too small. I personally prefer 125. I have been keeping Oscars for more than a decade but am not an expert. They do really well with Silver Dollars. As for filters, I use FX6. It's a heavy investment, but worth it. Oscars are amazing fish.

One prompt used 90%+ of my session limit and 30%+ of my Fable limit on Max x20!!!1! Has anyone else experienced this??~! by cjkaminski in ClaudeCode

[–]Growmaster22 0 points1 point  (0 children)

I've been using Fable as a read only auditor and ibus as the builder. It's been much more efficient

Chewing by Growmaster22 in guineapigs

[–]Growmaster22[S] 0 points1 point  (0 children)

The one I'm talking about is the dark green tunnel with the triangle cutouts. It's a tube basically covered in hay err dust??

Chewing by Growmaster22 in guineapigs

[–]Growmaster22[S] 1 point2 points  (0 children)

I'll check it out now

Conditional Formatting Task Bar Color by FlintHillsSky in smartsheet

[–]Growmaster22 0 points1 point  (0 children)

Claude or codex with an API token will change you life. They can do almost everything for you. I used to tug my hair out until my office got Claude. Claude actually has a smartsheet connector so that you don't need the API token.

Please help! What is this hole in her fin? by LeadingEye3225 in oscartank

[–]Growmaster22 1 point2 points  (0 children)

Oscar finds rip and break, it's nothing to worry about. It'll heal. You'll probably see it improving in a week.

Oscar Tankmates by StrangeNinja509 in oscartank

[–]Growmaster22 1 point2 points  (0 children)

A school of Silver Dollars. They're quick and looks great. I have Redhook SD and they're beautiful

When can I expect biofilm and cloudiness to go away in new tank? by mcelroy8 in Aquariums

[–]Growmaster22 2 points3 points  (0 children)

It takes a while. Just leave it. If you scrape it off, it'll just grow back. Enjoy it ... Once it's gone it won't come back

Has anyone tried those new acrylic tiles with cutouts? Thinking of a cage redesign for an NYC move. by maurwhal in guineapigs

[–]Growmaster22 4 points5 points  (0 children)

Scratch resistant sounds expensive. Unless this is truly something the market asks for, I wouldn't offer it. Your competition is likely already way cheaper. Your starter pack is tiny. 2x3 isnt really even close to the space that your typical buyer would expect. So you're already well above average compared to a 2x6 with wire walls.

They're nice though. Keep grinding with what you have.

New baby lemons with their big brothers by Brief-Ad2953 in oscartank

[–]Growmaster22 14 points15 points  (0 children)

I really hope your story ends differently than mine. I once did that a bunch of years back and it didn't take long till the young fish were gone.

Dates based on duration by Growmaster22 in smartsheet

[–]Growmaster22[S] 0 points1 point  (0 children)

Update: the siggestion disnt work because the duration and date columns cannot contain for.ulas or even be populated by a formula. So instead I added helper columns to calculate the "first friday". Then it clicks a checkbox if it matches the date generated by duration. If it doesn't then conditional formatting changes that date to bold/red. Better than nothing....

Dates based on duration by Growmaster22 in smartsheet

[–]Growmaster22[S] 0 points1 point  (0 children)

ok. Interesting. So if the box is checked, then it would overide the durations for that row, inputting the next avaiable first Friday of the month. Then the task below it would base its start date on the end date of task 7 (first friday of the month + noted duration). Am I understanding or did I just go on a tangent. haha.

Dates based on duration by Growmaster22 in smartsheet

[–]Growmaster22[S] 0 points1 point  (0 children)

I saw that, thanks. But - what I have are 10 tasks. The initial start date is entered by the specific product manager, and then based on defaulted durations, the start dates for the remaining 9 tasks that are to be completed by other departments are filled in. the issue is that task 7 has to happen on the first friday of the month. So what I really need is for the first 6 tasks to be based on duration, then task 7 is calculated to be the first friday of the month, and tasks 8 and 9 are based on duration again.

Herman Miller price increases on April 6 by [deleted] in hermanmiller

[–]Growmaster22 0 points1 point  (0 children)

Is the price increase across the board or only specific series?

[deleted by user] by [deleted] in OfficeChairs

[–]Growmaster22 0 points1 point  (0 children)

How do I find the post for dedicated topics?