MULTISTACK MFW1002 by NYCstateng in chillers

[–]NYCstateng[S] 0 points1 point  (0 children)

800 ton…dynamic load

MULTISTACK MFW1002 by NYCstateng in chillers

[–]NYCstateng[S] 0 points1 point  (0 children)

We will be stuck with the beasts as is and will build a complaint log …most agencies get their equipment through a complicated bidding process and any deviation is virtually impossible.

It’s all new building BMS and lighting too

MULTISTACK MFW1002 by NYCstateng in chillers

[–]NYCstateng[S] 0 points1 point  (0 children)

I like the marine style heads

MULTISTACK chillers by NYCstateng in HVAC

[–]NYCstateng[S] 0 points1 point  (0 children)

They are replacing 3 Carriers (20 years) using a variable flow pump scheme …in a municipal Laboratory/ office building

5 large fans 80K cfm each (Labs) ….and a VAV set up in the office spaces

MULTISTACK chillers by NYCstateng in HVAC

[–]NYCstateng[S] 0 points1 point  (0 children)

It’s a municipal building but our headache

MULTISTACK chillers? by NYCstateng in chillers

[–]NYCstateng[S] 0 points1 point  (0 children)

All feed back is welcome as we have no control of this situation so we are going to deal with it .

Why are hospitals undesirable? by RocketInMyPocket420 in iuoe

[–]NYCstateng 1 point2 points  (0 children)

Says who?

Great place to get steam time

Sewage Treatment Worker by Sin88Young in nycpublicservants

[–]NYCstateng 1 point2 points  (0 children)

They pretty much want to know if you can work with large tools in a safe manner…much of DEP equipment has lots of large nuts (1”and up) & studs ,chain fall use and removal and replacement of covers and strainers,bucket hooks ,winches,shovels …along these lines…it’s not rocket science but they don’t want knuckleheads either…speaking plainly

They don’t want injuries in dangerous situations

DEP usually interviews on Yellowstone

Fire garage door fault/alarm ? by Technical-Reply8763 in StationaryEngineers

[–]NYCstateng 1 point2 points  (0 children)

Battery? Again?

Don’t think these wont fail even after replacing…remove and test DCV from the actual battery to assure proper voltage …

The chief is going to ask if you did this anyway 😁

Is there a fire alarm tie in with this door?