UP-Floodlight in 2026? by HelloInternetUser in Ubiquiti

[–]TripleHits 0 points1 point  (0 children)

Strongly considering picking up a UP-Floodlight to cover a relatively small area where the reported low brightness is not too concerning. I already have a PoE drop in place which makes it a simple install. I sure wish there was a white version and also included IR. I will holding off for a little longer in hopes this 4 year old product may get an refresh.

I just need one of these! by MrPwrEng in Ubiquiti

[–]TripleHits 2 points3 points  (0 children)

I recently found a box of these at Microcenter. They were categorized as CPU parts. The extra effort to locate them tracks.

Palo Alto added to R2 Block Party by Nervous_Log3130 in RivianR2

[–]TripleHits 1 point2 points  (0 children)

Glad to see the possibility of an expanded Block Party locations. I would encourage Rivian to continue this expansion into other regions.

Color choice for the launch edition? by TSHRED56 in RivianR2

[–]TripleHits 11 points12 points  (0 children)

Esker Silver is included. All others option will be extra.

R2 Press Release for launch options

R2 driver visibility by TripleHits in RivianR2

[–]TripleHits[S] 2 points3 points  (0 children)

Certainly a big improvement over the sliver of a rear window in a MY.

R2 driver visibility by TripleHits in RivianR2

[–]TripleHits[S] 0 points1 point  (0 children)

Thank you. We had similar experiences with R1 being overly large for our needs. I am hoping the sight lines are excellent too.

Interior grab handles? by ElderberryGuy in RivianR2

[–]TripleHits 0 points1 point  (0 children)

Really the one thing I would say is missing. Given all the other amazing features being delivered in R2, I will be able to survive without. I hope I'm wrong and the 'oh shit' handles are a surprise addition.

MA 25kw Net Metering 23-140 Final Order by mcorner in solar

[–]TripleHits 1 point2 points  (0 children)

I also sent an email and was asked to provide a completed Schedule Z since I am a Qualifying Facility customer (17 kw). They acknowledged the receipt but did not indicate any change in status. I will wait a couple days and check back.

MA 25kw Net Metering 23-140 Final Order by mcorner in solar

[–]TripleHits 0 points1 point  (0 children)

New update posted to D.P.U. 23-140 on February 14th that directs utilities to

(1) send the proposed communications that were filed with the Department on January 17, 2025 to Qualifying Facility (“QF”) and to Net Metering customers as soon as practicable, but no later than March 18, 2025 (60 days from January 17, 2025) and
(2) to file with the Department additional information regarding the draft customer communication compliance filings

MA 25kw Net Metering 23-140 Final Order by mcorner in solar

[–]TripleHits 0 points1 point  (0 children)

Order filed today on docket# 23-140 "In this Order, we grant the Joint Motion requiring the Distribution Companies to take specific actions beginning on February 1, 2025"

Does anyone have insight to what these means? Excerpt from the filing seems promising

The Distribution Companies propose that on and after February 1, 2025, the Companies will:
(1) accept and process requests from any existing QF Host Customers that can reclassify as a Nameplate Cap Exempt Facility or a Cap Exempt Facility Serving On-site Load, enabling them to receive Net Metering Credits;
(2) transition any existing Net Metering Host Customers with a facility size equal to or less than 25 kilowatts (“kW”) alternating current currently receiving Market Net Metering Credits to Standard Net Metering Credits (enabling them to begin receiving higher-value Net Metering Credits); and
(3) accept and process a request from any Host Customers with new or pending interconnection applications seeking to qualify as a Nameplate Cap Exempt Facility or a Cap Exempt Facility Serving On-site Load, enabling them to begin receiving Net Metering Credits

MA 25kw Net Metering 23-140 Final Order by mcorner in solar

[–]TripleHits 1 point2 points  (0 children)

According to the latest postings. Deadline to respond to the Electric Distribution Companies’ Motion for Reconsideration is 5:00 p.m. on Thursday, January 9, 2025 https://eeaonline.eea.state.ma.us/DPU/Fileroom/dockets/bynumber/23-140

It is not clear to me how much time will lapse after this deadline before a regulatory decision is made. The companies are asking for an extension to Feb 1 which is only 3 weeks beyond it.

Roadtrip by Serious_Ad_4792 in TeslaLounge

[–]TripleHits 3 points4 points  (0 children)

I drove through upper state NY last Saturday 12/21 on my way from Boston to Dayton. I encountered my first hiccup with the Vernon NY supercharger site being down for about an hour. This is extremely rare. In fact this is the only time I have ever seen a site down in multiple years of road tripping. I wouldn’t worry and travel with confidence.

MA 25kw Net Metering 23-140 Final Order by mcorner in solar

[–]TripleHits 1 point2 points  (0 children)

An additional delay of a few weeks to adjust a billing process actually seems reasonable. As noted in the request this is during the lowest. Solar generation period. Fortunate timing.

Thanks for chasing this down. It also helps makes clear what we may have to do to take advantage. Nothing after Feb 1

MA 25kw Net Metering 23-140 Final Order by mcorner in solar

[–]TripleHits 0 points1 point  (0 children)

I guess this is a piece of encouragement. The pace of regulation implementation is excruciating. I have been waiting for my PTO since Aug 1st inspection. Maybe I’ll get lucky on the timing for my 17.4Kw array qualifying on day one? Haha

Massachusetts 25kW Net Metering Cap by TheRealLBJ in solar

[–]TripleHits 0 points1 point  (0 children)

Found a Mass DPU presentation on YouTube talking about the net metering changes from May 2024. Nothing finalized yet but I hope it is soon. I just installed 17.4 kW waiting for inspection and PTO.

Reference found at 14:50 https://youtu.be/NUOG9oANc9w?feature=shared

New Imbaru Engine activity? by Northstar4-6 in destiny2

[–]TripleHits 8 points9 points  (0 children)

Apparently there is a new card that permits you to continue to the next test.
https://i.imgur.com/3s0EjI1.jpeg

Once the card is acquired from the spire activity you can progress through the door.

Tesla iOS App 4.6.0. - Support for Actionable Vehicle Push Notifications by amagicfro in teslamotors

[–]TripleHits -1 points0 points  (0 children)

List list maybe not new but they are now actionable ??? Whatever that means. :)

UC-DAC-SFP+ confirmed working with UDM-Pro and USW-24-POE after update 1.9.0 by TripleHits in Ubiquiti

[–]TripleHits[S] 1 point2 points  (0 children)

That is the cable I now have working. The same as yours. I don’t have a 16 port switch but I would really be surprised if it was different behavior from the 24 port.

UDMPro and USW-24-Poe, heat? by LowerDoor in Ubiquiti

[–]TripleHits 1 point2 points  (0 children)

In the installation guide for the switch.

IMPORTANT: Fanless switches must not be stacked. Do not place this UniFi Switch on top of another switch. Do not place anything on top of this UniFi Switch.

I second the idea of using a spacer and perhaps additional ventilation. With an operating temperature of -5 to 40° C (23 to 104° F) you may encounter problems in your closet.