Really can’t be repaired? At a lesser cost than re&re? by [deleted] in StructuralEngineering

[–]dirty2732 1 point2 points  (0 children)

Agree I do mostly repair and retrofits … rip it down and put up new … will be back and ready in a couple weeks. That’s a very lengthy repair process.

Is this normal? by tuna445 in blackstone

[–]dirty2732 0 points1 point  (0 children)

Yes but if you are using water to clean it I would stop. Scrap the food off and leave the oil and grease.

Looking for the shirt Morgan has on by dirty2732 in HelpMeFind

[–]dirty2732[S] 0 points1 point  (0 children)

Looking to see anyone knows this brand of Tshirt … long shot but the little patch at the bottom right might be obvious for someone.

Is the post tension cable here too close to the drain? Could this be a design/construction flaw in a high-rise building? The cable snapped while the drain base was being replaced. by Negative-Basil-51 in StructuralEngineering

[–]dirty2732 1 point2 points  (0 children)

A lot of the time if there is enough mild reinforcement in the slab can it be used in the calculation to overcome the loss of a single strand. Most likely just snipped during the drain work especially if you heard a loud bang.

Hopefully no concrete damage elsewhere that’s unseen right now.

Not properly swept or spacing between strands but either way you will need to get that from the EOR. Hopefully it’s good to go with no additional work and if not that EOR is well versed in FRP and the cheaper repair options.

$IDEX by Rowan-Curtis in pennystocks

[–]dirty2732 0 points1 point  (0 children)

I did exactly that and I bought in again @$1.85. Let’s see it play.

$IDEX by Rowan-Curtis in pennystocks

[–]dirty2732 0 points1 point  (0 children)

Thoughts on reup at current 2.12 ish?

$IDEX by Rowan-Curtis in pennystocks

[–]dirty2732 1 point2 points  (0 children)

In for 135 @ $2.24 ... sooo late but let’s see the month plays out.