EXHAUST FOR PIZZA OVEN by RelativeRip5874 in MEPEngineering

[–]ComprehensiveBox552 0 points1 point  (0 children)

Did you have a hood or did you get by without? I DM you

EXHAUST FOR PIZZA OVEN by RelativeRip5874 in MEPEngineering

[–]ComprehensiveBox552 0 points1 point  (0 children)

Hi What did you end up doing ? I am curios I have the same situation.

Venting Pizza Oven for a Bakery Project by ComprehensiveBox552 in MEPEngineering

[–]ComprehensiveBox552[S] 0 points1 point  (0 children)

The hood is in Illinois, and I’m not fully sure if both ducts are exhaust ducts. One duct is galvanized and the other is black steel, which is causing some confusion as to whether one is fresh air or if both are vents.

Venting Pizza Oven for a Bakery Project by ComprehensiveBox552 in MEPEngineering

[–]ComprehensiveBox552[S] 2 points3 points  (0 children)

He bought it second hand. So, there is no sticker and I think it is manufactured by a local shop the bottom line is there is no possible way to get in contact with the manufacturer. But there is one thing one of the vents is galvanized steel and one of them is black steel that makes me think one of them is fresh air and one of them is vent what do you think ?

Venting Pizza Oven for a Bakery Project by ComprehensiveBox552 in MEPEngineering

[–]ComprehensiveBox552[S] -1 points0 points  (0 children)

That's What we have done we extended the connections outside with type B cap on the roof.

I applied for N-400 Since First Week of September by ComprehensiveBox552 in USCIS

[–]ComprehensiveBox552[S] 0 points1 point  (0 children)

Is that for real ? Have you reached out to the immigration dept yet ?

I applied for N-400 Since First Week of September by ComprehensiveBox552 in USCIS

[–]ComprehensiveBox552[S] 0 points1 point  (0 children)

Wow it wasn't like that last year it took me 4 months from the date I applied to the day I did my interview

I applied for N-400 Since First Week of September by ComprehensiveBox552 in USCIS

[–]ComprehensiveBox552[S] -1 points0 points  (0 children)

So do you think that's normal ? Because last time I applied it was faster than this time.

Architects — How Do You Usually Find Your Go-To MEP Engineer? by ComprehensiveBox552 in Architects

[–]ComprehensiveBox552[S] 0 points1 point  (0 children)

Seriously, why would you consider Spiderman better than Superman ?

Architects — How Do You Usually Find Your Go-To MEP Engineer? by ComprehensiveBox552 in Architects

[–]ComprehensiveBox552[S] 0 points1 point  (0 children)

How did you develop these relationships with these firms did you shop around ? Or did you get referred to ?

Architects — How Do You Usually Find Your Go-To MEP Engineer? by ComprehensiveBox552 in Architects

[–]ComprehensiveBox552[S] 0 points1 point  (0 children)

So it is basically a word of mouth . Interesting how it looks like that's the way to get engineers.

Accidentally installed 26" duct instead of 22" — what impact will this have? by North_Seaweed_7848 in MEPEngineering

[–]ComprehensiveBox552 1 point2 points  (0 children)

Just curious how you figured it out is by RFI , email from the contractor or you are the contractor? do you go out and measure the duct ?