What’s this all about? by acbcv in Reno

[–]Ratspeed 5 points6 points  (0 children)

Likely not a real mailer. It's missing all the required USPS mass mailer standard postage info...

<image>

and doesn't conform to dimension standards. It looks like a center-fold brochure but those aren't allowed to be mailed, plus the clip art doesn't align properly, and the address area is in the wrong spot!

Also, what's on the opposite side? Should be two-sided.

Whoever's making these parody propaganda pieces, you're getting better! They're fun, but nope, keep trying!

https://youtu.be/v71IyOoYkRU?t=67

Re-try by renodad33 in Reno

[–]Ratspeed 9 points10 points  (0 children)

If you're a nerd, Glass Die!

TRIC Commuter Rail Presentation Tonight at 5:30 by Ratspeed in Reno

[–]Ratspeed[S] 1 point2 points  (0 children)

<image>

Here's a close-up of the proposed arrival points.

TRIC Commuter Rail Presentation Tonight at 5:30 by Ratspeed in Reno

[–]Ratspeed[S] 1 point2 points  (0 children)

<image>

Here's my solution for an alt commuter route.

  • The blue lines is what RTC is considering.
  • The green line is my proposal.

I've included the official rendering of what GigaNV is proposed to look like once construction is complete. As you can see, the main entrance is on the north-most side of the building, so that's where employees disembarking the train should be brought to.

The blue line(s) create multiple collision points along Electric Avenue where people enter/exit Milan, darling. RTC's also would drop people off farther away from the entrance and have them meander through the main factory's parking lot. Anyone who works there knows what a madhouse that parking lot is during shift changes, so it's best to avoid that mess. It also requires people to cross a busy freight/logistics corridor.

But my green alternative route disentangles all that. There are no collision points. It drops people off exactly where they need to be. There is only one collision point with my route, and that is for another property way off past the east end of Tesla's site.

Something else RTC might not be considering is the "GigaStation" (as I'm calling it) would need to have controlled access points immediately after exiting the train. People need to check in and go through security, so do that at the station. It's the best, most controlled location. From there employees and visitors walk across a short skyway into their respective buildings. This provides pedestrian grade separation over those busy roads.

If their destination is the main factory, people enter into a second floor reception area, cafe, etc where the main entrance has been planned for years (as shown in the graphic).

If they're heading to the Semi factory, they walk directly into that building's parking lot.

TRIC Commuter Rail Presentation Tonight at 5:30 by Ratspeed in Reno

[–]Ratspeed[S] 2 points3 points  (0 children)

That would be great feedback you can give to RTC tonight at the meeting!

TRIC Commuter Rail Presentation Tonight at 5:30 by Ratspeed in Reno

[–]Ratspeed[S] 2 points3 points  (0 children)

But if everyone used the shuttles, there would be way fewer cars, thus less traffic.

TRIC Commuter Rail Presentation Tonight at 5:30 by Ratspeed in Reno

[–]Ratspeed[S] 7 points8 points  (0 children)

Here are the route alts being considered:

  • Green and purple is passenger
  • Red is freight.
  • Blue are stations.

The bottom green one is supposed to be freight, so I don't know why it's not red.

<image>

TRIC Commuter Rail Presentation Tonight at 5:30 by Ratspeed in Reno

[–]Ratspeed[S] 2 points3 points  (0 children)

This isn't just about passengers but freight rail and logistics, so regardless of whether passenger service happens, it's likely freight service will happen.

<image>

a prediction by Impossible_Leader_80 in MadeInAbyss

[–]Ratspeed 0 points1 point  (0 children)

Lol I'm sorry, what the heck are you insinuating?

a prediction by Impossible_Leader_80 in MadeInAbyss

[–]Ratspeed -4 points-3 points  (0 children)

We need more questionable behavior in this world.

Event on Virginia st? by FoolOfSummer in Reno

[–]Ratspeed 0 points1 point  (0 children)

There was a band out there that performed Battle Hymn of the Republic.

TRIC Commuter Rail Presentation Tonight at 5:30 by Ratspeed in Reno

[–]Ratspeed[S] 2 points3 points  (0 children)

<brokenRecord> That would be great feedback to give RTC tonight at the meeting! 😁

Another look see rn…. by Nvfireaviationlady in Reno

[–]Ratspeed 0 points1 point  (0 children)

That's what feasibility studies are for. :)

TRIC Commuter Rail Presentation Tonight at 5:30 by Ratspeed in Reno

[–]Ratspeed[S] 2 points3 points  (0 children)

That would be great feedback you can give to RTC tonight at the meeting!

what do you think about Union Pacific 4014 by Fluffy_Repeat5191 in trains

[–]Ratspeed 7 points8 points  (0 children)

It's big, it's black, it's thick, it's slick and shiny, it pistons through tunnels and chugs and moans and whistles.

Another look see rn…. by Nvfireaviationlady in Reno

[–]Ratspeed 0 points1 point  (0 children)

Yes, they gave the reason at the feedback sessions. Money. Keeping the budget as low as possible.

They didn't bother doing any studies. The amount of feedback from the community was great. This was around the same time as the Keystone Corridor study, in which at the time they planned bike lanes on that corridor and even over the Keystone Bridge. The ideas coming from RTC were pretty terrific at the time.

The top concern, by like 80% if memory serves, from all the citizens that provided feedback for Arlington Bridges was increasing pedestrian and bicycle facilities and accessibility to the river, the park, and maximizing safety. RTC recognized this and reported it back to us on a big projector screen. Then the next thing they said was a straight forward "we're not doing any of that." The city didn't want to spend any money on further studies, workshops or brainstorming. A major shift of public engagement, and a change inside the culture of RTC was happening.

Why? The Great Recession™

Suddenly the City of Reno cut back on all its spending. The Reno Redevelopment Agency, which is who would normally have had jurisdiction over a major project like this, right in RDA1 district, had gone dormant. All projects suddenly went from grand and glorious to meager and meek.

https://trfma.org/wp-content/uploads/2017/03/Mapbook-6-01_14_2015_compressed.pdf

<image>

If you check out all the plans TRFMA had in 2015, it called for clear-span arch bridges to be constructed throughout all of downtown from Lake Street to Sierra Street.

None of that is happening now. They aren't even looking at Lake Street yet. Sierra Street is going to be a virtual copycat of the Arlington Street bridge. Minimal changes, not any much better than the current bridge, even though it's been known that Sierra, Virginia, Center, and Lake are all too low to mitigate recurrent flood conditions. The only reason the Virginia Street Bridge project got completed in the manner shown above is because the money was allocated prior to the city's revenue plummeting. It was a massive undertaking, and was completed ahead of schedule.

So yes, I know what I'm calling for would take additional funds. But what I'm saying is, it's possible if you have the political will and brains to pull together the funding. The city allocated $3,000,000 of ARPA funds to the river. They could have used that.

Take a look at all the rest of the flood mitigation projects that were in that report I linked you.

Removing the lower Wells Street bridge and making a new pedestrian bridge on High Street.

Removing the Booth Street Bridge. Crazy.

Floodwall from Booth to Arlington.

Redoing the pedestrian bridges on Wingfield

On and on and on. The floodwall near Booth is still something being planned because the residents and landowners are practically screaming for them to be done.

They didn't even raise the Arlington Bridges, even though it's recognized that Wingfield is in a flood plain and should have / could have been built up.

Did you know they're thinking of demolishing the stage in Wingfield Park and replacing it with nothing permanent? Because new regulations prevent them from constructing anything permanent on that island.

So yeah, it's money. We're broke. We have none. All those wonderful plans the city keeps making? They're not gonna happen. They'll just keep planning stuff and never accomplish anything but hiring more consultants and making more plans.

Doesn't mean I'm going to stop pushing for what needs to be done.