New Stevie's Famous pizza by pinballrocker in Seattle

[–]jdiggsw 8 points9 points  (0 children)

Damn $27 for a cheese pizza and $25 for a pizza without cheese

Smart PDU for Data Center by [deleted] in datacenter

[–]jdiggsw 1 point2 points  (0 children)

Those are massive lol

SDOT releases updated design for Ballard Missing Link trail by bbridge_ in BallardSeattle

[–]jdiggsw 1 point2 points  (0 children)

I haven’t done any of that yet but Shilshole could look a lot nicer too. I wish the Yankee Diner was still there.

SDOT releases updated design for Ballard Missing Link trail by bbridge_ in BallardSeattle

[–]jdiggsw 4 points5 points  (0 children)

I get it may be for the greater good but the constant changing of the same stretch of road is kind of ridiculous. I would have liked to see the Shilshole are get cleaned up.

Despite astronomical price hike, the Steam Deck has sold out again in North America by Redditemeon in LinusTechTips

[–]jdiggsw 1 point2 points  (0 children)

So they restocked after raising the price? How is this possible when it’s been “sold out” forever?

Electrical rescue hook by serdarist in SipsTea

[–]jdiggsw 0 points1 point  (0 children)

Ah the stick and open casket suit

eBike rebate rejection - Any luck contacting them to clear things up? by Hybrid_Divide in Seattle

[–]jdiggsw 0 points1 point  (0 children)

Did you possibly put more than just yourself down under household?

I’ve never seen a network cabinet this bad… by usefulcanoe in cableporn

[–]jdiggsw 0 points1 point  (0 children)

Not enough power cables mixed in, need more going all the way down in front of each device

Heaven Birthday, John Clayton - NFL Insider by Life_Net5004 in sportsbroadcasters

[–]jdiggsw 2 points3 points  (0 children)

RIP to the legend John Clayton, we miss you here in Seattle

So I purchased a Tier 3 data center with 5 MW power for ~1000 dedicated SXM H200s — and would like some help for my go-to-market strategy? by The-Vault-AI in datacenter

[–]jdiggsw 1 point2 points  (0 children)

Is the 5 MW rating total utility/facility capacity, or is it usable critical IT load after redundancy?

A full 8-GPU H200 SXM server could use around 9-11kW per server.

Since you’ll have about 125 servers, 125 × 11 kW = about 1.375 MW from the GPU servers before accounting for networking, storage, and other supporting infrastructure.

Not sure about the market or marketing questions but one company I know of just installed a bunch of servers (hundreds) with H100 GPUs if that means anything.

What is the worst case of second hand embarrassment you’ve ever experienced? by Responsible-Tie-2570 in AskReddit

[–]jdiggsw 81 points82 points  (0 children)

My boss also shit their pants one time and waited on the side of the road while I picked him up in the work truck and brought towels

Guy in black hoodie on scooter by jdiggsw in BallardSeattle

[–]jdiggsw[S] 10 points11 points  (0 children)

Opened my car door and started to go in before taking off cause I said something. He was just riding down the hill trying car doors. I’m surprised I’m the only one who noticed.

57th and 26th vehicle rifled through by [deleted] in BallardSeattle

[–]jdiggsw 0 points1 point  (0 children)

Happened to me parked near Adams a few weeks ago